What is in a full bathroom renovation? A line-by-line BOQ breakdown

Two contractors can price the same bathroom and land tens of percent apart, simply because different lines were included or left out. Here is how to read a bathroom quote line by line: what should be in it, what quietly drops out, and why the waterproofing line decides whether a price is really cheap.

Updated July 2026 · Nur Renovations

The short answer

There's no single number that fits every bathroom. The price depends on how deep the demolition goes, whether the pipes are replaced, and the finish you choose, and the waterproofing line is what decides whether a cheap price is really cheap or just pushing the cost forward. You get the real figure only after a site visit and a transparent BOQ you can check line by line.

A small finished bathroom after a complete renovation

How much does a bathroom renovation cost is the first question everyone asks, and the hardest one to answer with a single number. A small, simple bathroom and a same-size bathroom stripped to the concrete with new pipes and full waterproofing are two completely different jobs, even if they look identical at the end.

The real problem isn't the price itself, it's what sits behind it. The word complete sounds like it covers everything, but it means nothing until you see the BOQ, the lines the work is built from. Two contractors can price the same bathroom and land far apart, simply because one puts the waterproofing line, the waste removal and the pipe replacement inside the price, while for the other they land on you as an extra mid-job.

In this guide we break a full bathroom down line by line: what each stage includes, what is usually outside the price, and how to read a quote so you compare apples to apples. The numbers themselves we leave as rough ranges for orientation only, because the real price depends on the size of the room, the state of the infrastructure and the finish you choose, and is set only after a site visit.

01What complete actually means, and why it isn't enough

Complete is supposed to say that the price covers all the work from the start to a bathroom ready to use: both materials and labor, with no surprises in the middle. In practice different contractors put different things into their complete, so the same word covers jobs that aren't the same.

The only way to know what you bought is a BOQ: an ordered list of every stage of the work with its quantity. A detailed BOQ lets you see exactly what is in, compare contractors on the same basis, and catch a dropped line before it comes back as an extra. A one-line quote, a single sum with no breakdown, isn't a cheaper quote. It's just a quote you can't check.

With us, every quote is a transparent BOQ you see in front of you: every stage, what it includes, and what sits outside it. That way it's clear from the start what you're paying for, and no line shows up only after the room has already been torn out.

Field tip

When you compare two quotes, don't look at the bottom line first. Count how many lines each quote has. The cheaper quote usually just contains fewer lines, and the difference comes back mid-job.

02Demolition, waste removal and base prep

Every bathroom renovation starts with taking out the existing. This line covers stripping the tiles and floor, sometimes down to the concrete, removing the old fixtures, and cleaning the base so you can build on it again. In older rooms, this is also the stage where you find out what's really hiding behind the walls.

Two lines drop here most often. The first is waste removal: getting the rubble out of the home and hauling it to a licensed disposal site, a real line in cost and time, not something that happens on its own. The second is base repair after demolition, leveling and prepping the surface before waterproofing and tiling. If the base isn't level, no tiling will sit on it well.

  • Stripping existing tiles, floor and fixtures
  • Hauling the rubble out of the home to a licensed site
  • Leveling and prepping the base before the waterproofing stage

03Plumbing: water and waste pipes

This is one of the easiest lines to hide in a quote, and one of the most expensive to fix after the fact. Plumbing covers the water points, the pipe runs, the waste and drain connections, and sometimes relocating a point when a toilet or shower moves from its spot. The important question is whether the pipes themselves are replaced or just reconnected.

In an old bathroom, old iron pipes or worn connections are a time bomb. If the wall is going to be opened anyway, this is the right moment to replace questionable pipes, because reopening a tiled wall in three years costs several times more. It's worth confirming in the quote whether pipe replacement is in, or whether it'll appear as an extra the moment something turns up behind the wall.

We work plumbing as part of the core, not as an occasional subcontractor, and we show in the BOQ what the water stage includes: which points, what is replaced and what is reconnected, and every pipe penetration that needs dedicated sealing around it.

Watch out

A quote that says nothing about the state of the existing pipes is a quote leaving itself room for an extra. In an old room, assume the pipes will be checked, and ask them to write explicitly whether replacement is included.

04Waterproofing: the line that decides if a price is really cheap

If there's one line you must never let drop from a quote, it's the waterproofing line. Waterproofing is the envelope that stops water from getting under the tiles into the concrete, into the adjoining wall and into the neighbor's flat below. It sits under the tiles, so when it's missing or done carelessly you can't see it, until damp appears and a finished room has to be torn out to reach it.

This is where the cheap-quote trap sits. It's very easy to drop the price by skipping a dedicated waterproofing layer, leaning on tile adhesive as if it seals, or giving up the flood test that proves the waterproofing works before tiling. The room will look finished and clean like one that was sealed properly, and the difference only shows up when it's too late.

With us the waterproofing line is the center of the job, not an add-on to it: double waterproofing in the wet areas, a documented flood test before tiling, and a written warranty on wet work. When you compare quotes, this line is the first one to confirm exists and is detailed, because a quote without real waterproofing isn't cheaper. It just pushes the cost forward, and grows it.

Watch out

If the gap between two quotes is unusually large, look in the waterproofing line first. That's usually where the money was cut, and that's also where the most expensive problem will show up in a few years. We go deeper on this in the waterproofing failures guide.

05Tiling, wall cladding and grout

The tiling line covers laying the tiles on the floor and walls, filling the grout, and every finish detail around it: thresholds, corners and edges. There's a big difference here between tiling that sits flat with even grout lines and tiling that looks fine at first glance but is wavy and imprecise.

The materials themselves, the tiles, are usually a separate line from the labor, and sometimes yours to buy entirely. It's worth checking in the quote whether the tile price is in or out, and up to what price per meter. A particularly expensive tile or a large format that needs complex cutting work can move the price, so they're set against the finish you chose.

Fewer grout lines means fewer weak points over time, so choosing the tile format isn't only about looks but about durability too. We present labor and material separately in the BOQ, so you know what you're paying for the work and what for the tile.

06Fixtures, finish and the installation line

The last stage is what you see: toilet, basin, taps, shower, vanity, mirror and sometimes shower glass. Here it matters to separate two lines that get mixed up a lot: the price of the fixtures themselves, and the line for installing them. It's easy to see a quote that includes installation but assumes you'll buy the fixtures yourself, or the other way around.

If the fixture price is inside the quote, ask what price range it assumes. A basic fixture range and a premium one are a meaningful gap, and without a clear range it's easy to reach a final price different from what you pictured. If the fixtures are yours, make sure the installation, connection and sealing around them are included in the work.

We separate the fixtures line from the installation line in the BOQ, and when the fixtures are yours we state a range for orientation only so you can budget, without it counting as a fixed price.

  • Toilet, basin, taps and shower, installed and connected
  • Vanity, mirror and accompanying accessories
  • Shower glass, usually a separate line on its own

07What is usually outside the price, and worth asking about up front

Even in a fair, detailed quote there are lines that are normally left out, simply because they aren't known in advance or depend on your choice. Better to know about them at the start than to run into them mid-job. These are the lines most worth asking about before you sign.

Some depend on what's found after demolition, like repairing rotted infrastructure or questionable pipes that weren't visible before. Others depend on you, like a finish upgrade or fixtures more expensive than the priced range. A good quote doesn't commit to what can't be seen in advance, but it does tell you clearly what isn't included and how it'll be priced if it comes up.

  • Electrical and lighting work in the room, if a point has to be moved or added
  • Treating infrastructure found only after demolition, like damaged pipes or concrete
  • A finish or fixture upgrade beyond the price range the quote is built on
  • Work outside the bathroom itself, like repairing the neighbor's ceiling if damage was already done

08How to read a bathroom quote without getting caught

Once you know all the lines, it's easier to read a quote and see what's missing. A good quote doesn't have to be the most expensive one, but it has to be detailed enough that you can check it and compare it to another on the same basis.

The numbers will always stay a range until the site visit, because two same-size rooms can need completely different work depending on the state of the infrastructure and the finish you choose. So we don't give a fixed price over the phone, we come, see the room, and produce a transparent BOQ you can check line by line.

  • Confirm the waterproofing line exists, is detailed, and includes the flood test and warranty
  • Check whether pipe replacement is in, especially in an old room
  • Check whether waste removal and base repair are inside the price
  • Confirm whether the fixture and tile prices are in, and at what range
  • Count the lines: a quote that's too thin is hiding future extras

Want to know what your bathroom will cost? Let's see it

A site visit, a transparent BOQ you can check line by line, and a written warranty on wet work. No vague phone price and no extras that appear mid-job.

Site visit & quote

Related to this guide

Bathroom renovation cost FAQ